ANGGARAN BIAYA
Nama Proyek: Pembangunan Komplek Pesantren Pasambangan Jati
Alamat Proyek: Blok Simuprit RT 02 RW 02
Desa Penpen Kecamatan Mundu Kabupaten Cirebon
No.
|
Jenis Barang dan Tenaga
|
Satuan
|
Harga Satuan
|
Jumlah (Rp)
|
||||
(@Rp)
|
||||||||
1
|
Batu Kali
|
150
|
rit
|
210,00
|
31,500,000
|
|||
2
|
Batu Merah
|
180000
|
biji
|
400
|
72,000,000
|
|||
3
|
Besi 10 inch
|
2000
|
bt
|
45,000
|
90,000,000
|
|||
4
|
Besi 12 inch
|
800
|
bt
|
49,000
|
39,200,000
|
|||
5
|
Besi 8 inch
|
3000
|
bt
|
28,000
|
84,000,000
|
|||
6
|
Besi 6 inch
|
900
|
bt
|
16,000
|
14,000,000
|
|||
7
|
Besi 16 inch
|
120
|
bt
|
76,000
|
9,000,000
|
|||
8
|
Besi Pagar
|
115
|
m
|
700,000
|
80,500,000
|
|||
9
|
Pasir Pasang
|
3000
|
rit
|
180,000
|
540,000,000
|
|||
10
|
Pasir Urug
|
147
|
rit
|
160,000
|
23,000,000
|
|||
11
|
Seplit (batu beton)
|
340
|
rit
|
500,000
|
170,000,000
|
|||
12
|
Kayu Kusen Kamper
|
50
|
kubik
|
4,500,000
|
225,000,000
|
|||
13
|
Kayu Kap
|
40
|
kubik
|
2,500,000
|
100,000,000
|
|||
14
|
Kayu Reng
|
400
|
ikat
|
200,000
|
80,000,000
|
|||
15
|
Kayu Kaso 5 x 7 cm
|
750
|
ikat
|
120,000
|
28.800.000
|
|||
16
|
Kayu Kaso 4 x 6 cm
|
288
|
ikat
|
80,000
|
23.040.000
|
|||
17
|
Papan Risplang
|
48
|
bt
|
80,000
|
90,000,000
|
|||
18
|
Papan Cor
|
2500
|
batang
|
25,000
|
62,500,000
|
|||
19
|
Semen
|
5000
|
sak
|
50,000
|
250,000,000
|
|||
20
|
Kawat Tali
|
400
|
kg
|
15,000
|
6,000,000
|
|||
21
|
Paku
|
1500
|
kg
|
16,000
|
24,000,000
|
|||
22
|
Keramik
|
1500
|
m2
|
48,000
|
72,000,000
|
|||
23
|
Daun Jendela
|
340
|
stel
|
450,000
|
153,000,000
|
|||
24
|
Daun Pintu
|
90
|
stel
|
2,000,000
|
180,000,000
|
|||
25
|
Plamur Tembok
|
50
|
kaleng
|
210,000
|
10,500,000
|
|||
26
|
Menie Kayu
|
20
|
kaleng
|
25,000
|
500,000
|
|||
27
|
Cat Tembok 25 kg
|
65
|
kaleng
|
370,000
|
24,050,000
|
|||
28
|
Cat Kayu ukuran 1 kg
|
145
|
kaleng
|
60,000
|
8,700,000
|
|||
29
|
Plamir Kayu (Impra)
|
35
|
Kaleng
|
50,000
|
1,750,000
|
|||
30
|
Karpus
|
980
|
biji
|
5,000
|
4,900,000
|
|||
31
|
Genteng Munir
|
32600
|
buah
|
3,000
|
97,800,000
|
|||
32
|
Triplek
|
500
|
lembar
|
120,000
|
60,000,000
|
|||
33
|
Paralon 2 in
|
300
|
batang
|
45,000
|
13,500,000
|
|||
34
|
Bilboard 2 x 4 m
|
60
|
buah
|
350,00
|
21,000,000
|
|||
35
|
Paving Blok
|
300
|
m
|
35,000
|
10,000,000
|
|||
36
|
Tenaga Tukang 15org
|
1080
|
hari
|
45,000
|
729,000,000
|
|||
37
|
Tenaga Kernet 45org
|
1080
|
hari
|
35,000
|
1,701,000,000
|
|||
JUMLAH TOTAL
|
5,130,000,000
|
|||||||
REKAPITULASI ANGGARAN
BIAYA :
|
||||||||
1.
|
Jumlah Material
|
2,700,240,000
|
||||||
2.
|
Jumlah Tenaga Kerja
|
2,430,000,000
|
||||||
Jumlah Total
|
5,130,000,000
|
|||||||
Terbilang
: Lima
Milyard Seratus Tiga Puluh Juta Rupiah.
Cirebon, Februari 2012
Ketua, Sekretaris,
KH.
Muchlis Abdillah, SH Muhamad
Mukhtar Zaedin
Rek Infak: Mandiri Syariah:0230 11 6804. BNI Syariah:0169 88 7806.
BRI:0406-10-000-762531. BRI:0406-01-000-966533. BCA:3740616021. SEMOGA BERKAH
dan BERMANFAAT.
Tidak ada komentar:
Posting Komentar